Recent Work

CO OP Cat A Fit out Mechanical and Electrical

Full Cat A Fit out of a new Cooperative store in Bugle, Cornwall. This included all electrical services, containment for electrical, refrigeration and data services, Extraction for bakery, external lighting and signage and LED store lighting throughout.

Solar Installation for solar housing upgrade scheme

Installation for multiple properties in the south west, carrying out rapid installation in line with a solar installation scheme. Working closely with a roofing contractor we managed the project and installed retrospective solar systems to improve the residents energy efficiency and reduce their energy costs. We created an installation team with the roofing contractor and delivered the project through our own project management.

College Laboratory Electrical Installation

Full fit out of new wing of agricultural college. We undertook all electrical works from the mains supply in, to the new wing and all circuits controlling the heating and system controls. Our works included the Gas proving system, Co and Co2 detection, Smart DALI lighting and containment for all services. During the project we took on the installation of the fire alarm system and extraction system. While taking on the additional services to assist our client, there was no delay or extension the project and handover was on time and on budget.

College Data floor Electrical and Data Installation

Full fit our of data and electrical services for a college wing. Our works included containment for all services, all electrical services, dado containment, lighting and emergency lighting, super fast cat6 A data network and outlets, patch panel termination and network integration.

Swindon Borough council EV chargers installation

Supply and installation of Electric Vehicle charge points for Swindon borough council vehicles to charge from. We supplied a remote management software to offer a back office function supporting the chargers, assessing their operational condition and limiting charging to only authorised users.

EV chargepoint installation for 9 Apartments

Retrospective installation of electric vehicle charge points at a newly built apartment block in the bath area. For this installation we supplied each EV point from the supply to the apartment, so use and energy costs we limited to the apartment occupant. We programmed and supplied key fobs for each apartment to ensure secure operation and use of the EV point at their parking bay.

Electrical design and installation for 37 apartments in Swindon

Full design and installation of electrical services to all apartments, communal areas and 2 commercial units, including the provision of supply to EV points that can be added retrospectively as the resident requires, supplied to their parking bay from their apartments supply.